Complete implementation steps of standard earth system The general steps of implementing an earth well How to run a surface earth well How to implement a deep earth well Important points of earth well implementation in mountainous conditions Important points of implementing an earth well in wet places The reasons for the necessity of an earth well test by a reputable company
Complete implementation steps of an earthing system:
The stages of the complete implementation of the earthing system of a building or an industrial shed are respectively: Soil specific resistance test, (electrical earth well implementation), lightning arrester system earth well implementation, (earth well test), precision instrument system earth well implementation, Fondanson earth connection and columns according to the engineering system instructions, lightning arrester implementation, conductor installation descending and connecting it to the lightning arrester earth well, implementing secondary protection, implementing the integration of all the necessary equipment according to the standard chart, determining the type of earth system which is usually Tnc-s and finally obtaining the certificate of the Ministry of Labor. It should be mentioned for sheds An industrial earthing well should be considered for the precision instrument system, and the minimum distance between the electrical earthing well and the lightning arrester earthing well and the precision instrument earthing well is 20 meters. Read more: Types of earth wells and their basics and standards
Leave A Comment